奇米777狠狠888俺也去,成年人av大片亚洲第一区二区三区,免费一级视频在线观看v片,午夜毛片免费日b

冷再生施工和機械租賃業(yè)務
筑路架橋,奉獻社會;以人為本,不斷創(chuàng)新

服務熱線

18264104888

新聞中心

首頁>>新聞中心

帶你了解冷再生機的使用方法

來源:http://www.cpssc145.com/ 日期:2025-05-07 發(fā)布人:

在道路養(yǎng)護與改造工程中,冷再生機因其、經(jīng)濟的特點,已成為處理舊路面材料的設備。為確保施工質(zhì)量與效率,必須嚴格按照規(guī)范流程操作,下面將詳細說明使用冷再生機的具體方法。

In road maintenance and renovation projects, cold recycling machines have become the preferred equipment for processing old pavement materials due to their high efficiency, energy saving, environmental protection, and economic characteristics. To ensure construction quality and efficiency, it is necessary to strictly follow the standardized procedures. The specific methods of using cold regeneration technology will be explained in detail below.

施工前的準備工作關(guān)重要,要對作業(yè)路段進行細致的勘察。技術(shù)人員需要準確評估道路損壞程度,仔細檢查基層結(jié)構(gòu)狀況,并確認地下管線分布位置。針對基層存在嚴重病害的路段,如出現(xiàn)大面積坑槽或松散現(xiàn)象,必須預先制定專項處理方案。同時要根據(jù)道路實際尺寸和工期要求,科學規(guī)劃設備行進路線和工作區(qū)域,避免出現(xiàn)重復施工或遺漏作業(yè)的情況。

The preparation work before construction is crucial, and the first step is to conduct a comprehensive and detailed survey of the work section. Technicians need to accurately assess the extent of road damage, carefully inspect the condition of the underlying structure, and confirm the distribution of underground pipelines. For road sections with serious diseases at the grassroots level, if there are large areas of potholes or looseness, a special treatment plan must be formulated in advance. At the same time, it is necessary to scientifically plan the equipment travel route and work area according to the actual size of the road and the requirements of the construction period, in order to avoid repeated construction or missed operations.

設備檢查環(huán)節(jié)需要關(guān)注機械部件的運行狀態(tài)。操作人員應當仔細檢查發(fā)動機各項油液是否充足,查看傳動皮帶松緊度是否合適,確認液壓系統(tǒng)管路連接牢固無泄漏。特別要注意檢查轉(zhuǎn)子刀具的磨損情況,磨損嚴重的刀具必須立即更換。電氣系統(tǒng)方面,要確保所有線路完好無損,各類儀表指示燈工作正常。設備調(diào)試時需進行空載試運行,調(diào)整轉(zhuǎn)子轉(zhuǎn)速和噴灑系統(tǒng)參數(shù),確保其符合施工技術(shù)要求。

The equipment inspection process needs to focus on the operational status of mechanical components. The operator should carefully check whether the engine's various fluids are sufficient, check whether the tightness of the transmission belt is appropriate, and confirm that the hydraulic system pipeline connections are firm and leak free. Special attention should be paid to checking the wear of the rotor cutting tools, and tools with severe wear must be replaced immediately. In terms of electrical system, it is necessary to ensure that all circuits are intact and all instrument indicators are working properly. During equipment debugging, it is necessary to conduct a no-load trial run, adjust the rotor speed and spray system parameters to ensure that they meet the construction technical requirements.

20210527050552167

材料準備工作同樣不可忽視,必須根據(jù)設計要求準備足量的乳化瀝青、水泥等添加劑。所有材料都要經(jīng)過嚴格的質(zhì)量檢測,確保各項指標符合標準規(guī)范。同時要對回收的舊料進行級配分析和含水量測試,為后續(xù)的配合比設計提供準確依據(jù)。

Material preparation work cannot be ignored, and sufficient amounts of emulsified asphalt, cement and other additives must be prepared according to design requirements. All materials must undergo strict quality testing to ensure that all indicators meet the standard specifications. At the same time, grading analysis and moisture content testing should be conducted on the recycled old materials to provide accurate basis for subsequent mix design.

施工作業(yè)過程中,要將冷再生機準確就位。操作人員需要調(diào)整設備位置,使轉(zhuǎn)子中心線與道路中心線完全對齊,并通過支腿調(diào)平設備。參數(shù)設置方面,要根據(jù)路面材料硬度合理確定轉(zhuǎn)子轉(zhuǎn)速,通常控制在3-6米/分鐘的行進速度較為適宜。拌和深度必須嚴格按照設計要求控制,確保舊料與添加劑充分混合又不損傷路基。添加劑噴灑系統(tǒng)要保持穩(wěn)定運行,確保按比例均勻噴灑。

During the construction process, the first step is to accurately position the cold recycling machine. The operator needs to adjust the position of the equipment to align the rotor centerline completely with the road centerline, and level the equipment with the support legs. In terms of parameter settings, the rotor speed should be reasonably determined based on the hardness of the road surface material, usually controlled at a suitable travel speed of 3-6 meters per minute. The mixing depth must be strictly controlled according to the design requirements to ensure that the old materials and additives are fully mixed without damaging the roadbed. The additive spraying system should maintain stable operation to ensure even and proportional spraying.

實際操作時,要先啟動轉(zhuǎn)子達到設定轉(zhuǎn)速,再緩慢推進設備。作業(yè)過程中要持續(xù)監(jiān)控發(fā)動機轉(zhuǎn)速、液壓壓力等關(guān)鍵參數(shù),同時觀察混合料的均勻程度。完成拌和后要及時進行攤鋪壓實作業(yè),采用先輕后重的碾壓方式,確保路面達到設計要求的平整度和密實度。

In actual operation, the rotor should be started first to reach the set speed, and then the equipment should be slowly advanced. During the homework process, it is necessary to continuously monitor key parameters such as engine speed and hydraulic pressure, while observing the uniformity of the mixture. After completing the mixing, timely paving and compaction operations should be carried out, using a light to heavy rolling method to ensure that the road surface meets the design requirements for smoothness and compactness.

施工結(jié)束后的維護工作同樣重要。要徹底清洗設備各部件,特別是轉(zhuǎn)子和噴灑系統(tǒng)。完成清洗后要對所有潤滑點加注潤滑油,檢查緊固件狀態(tài)。質(zhì)量檢測環(huán)節(jié)需要使用儀器測量路面壓實度和平整度,發(fā)現(xiàn)問題要及時處理。要清理施工現(xiàn)場,修復受損的附屬設施,確保道路恢復正常使用。

The maintenance work after the completion of construction is equally important. Firstly, it is necessary to thoroughly clean all components of the equipment, especially the rotor and spray system. After cleaning, add lubricating oil to all lubrication points and check the status of fasteners. The quality inspection process requires the use of professional instruments to measure the compaction and flatness of the road surface, and any problems found should be dealt with in a timely manner. Finally, it is necessary to clean up the construction site, repair damaged ancillary facilities, and ensure that the road is restored to normal use.

通過規(guī)范化的操作流程和細致的維護保養(yǎng),不僅能保證施工質(zhì)量,還能顯著延長設備使用壽命。如需了解更詳細的故障排查方法或特殊工況下的操作技巧,歡迎隨時咨詢技術(shù)人員。

Through standardized operating procedures and meticulous maintenance, not only can construction quality be guaranteed, but the service life of equipment can also be significantly extended. If you need more detailed troubleshooting methods or operating skills under special working conditions, please feel free to consult professional technicians at any time.

本文由冷再生機租賃友情奉獻.更多有關(guān)的知識請點擊:http://www.cpssc145.com真誠的態(tài)度.為您提供為的服務.更多有關(guān)的知識我們將會陸續(xù)向大家奉獻.敬請期待.

This article is a friendly contribution from Cold Recycling Machine Rental For more information, please click: http://www.cpssc145.com Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

閱讀/ Recommended reading

  在道路養(yǎng)護領(lǐng)域,冷再生機如同擁有 “妙手回春” 能力的 “路面醫(yī)生”,無需大規(guī)模開挖重建,就能讓老舊路面重獲新生。通過租賃冷再生機,施工方能夠以更經(jīng)濟的方式處理多種路面病...

舊路翻新 “神器” 大盤點:那些給力的冷再生機型號 2025-06-20
揭秘冷再生機的 “體型密碼”:租賃尺寸選擇攻略 2025-06-18
怎么找到靠譜的冷在生租賃公司? 2025-06-17
冷再生機租賃:路面翻新的“變形金剛” 2025-06-16

產(chǎn)品/ Recommended products