冷再生機(jī)施工前的準(zhǔn)備工作主要包括哪幾方面?
來源:http://www.cpssc145.com/ 日期:2022-12-26 發(fā)布人:
冷再生機(jī)施工前的準(zhǔn)備工作主要包括人員準(zhǔn)備、機(jī)械準(zhǔn)備、材料準(zhǔn)備、交通協(xié)調(diào)及后勤保障。下面冷再生機(jī)出租廠家就從這幾個(gè)方面來為您講解下相關(guān)內(nèi)容吧。
The preparation before construction of the cold regeneration machine mainly includes personnel preparation, mechanical preparation, material preparation, traffic coordination and logistics support. The following cold regeneration machine rental manufacturers will explain the relevant content to you from these aspects.
(1)材料要求:水泥選用強(qiáng)度等級為32.5、初凝時(shí)間≥3h、終凝時(shí)間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥。水泥應(yīng)具有良好的工作性、低水化、高后期強(qiáng)度、耐久性、耐腐蝕性和抗裂性能。
(1) Material requirements: Portland or ordinary Portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h shall be selected. Cement shall have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
(2)機(jī)械要求:工程施工過程通過再生機(jī)組來完成,再生機(jī)組包括:冷再生主機(jī)、水泥稀漿車、平地機(jī)、壓路機(jī)等。
(2) Mechanical requirements: the project construction process is completed through the regeneration unit, which includes: cold regeneration host, cement slurry truck, grader, roller, etc.


(3)人員要求:工程技術(shù)人員及機(jī)械操作人員應(yīng)經(jīng)過冷再生培訓(xùn)并經(jīng)過考核合格后方可上崗。
(3) Personnel requirements: engineering technicians and mechanical operators shall receive cold regeneration training and pass the examination before taking up their posts.
(4)工程協(xié)調(diào):作好施工總體計(jì)劃,采取不中斷交通半幅施工,作好施工期間交通疏導(dǎo)工作,準(zhǔn)備施工作業(yè)面的遮擋。
(4) Project coordination: make the overall construction plan, take the half width construction without interrupting the traffic, do a good job of traffic dredging during the construction, and prepare for the shelter of the construction working face.
此外要知道,冷再生機(jī)施工后,等路面強(qiáng)度達(dá)到要求后,用空壓機(jī)吹凈浮灰,撒布透層油后,上面灑石屑,之后開放交通。更多相關(guān)事宜就來我們網(wǎng)站http://www.cpssc145.com進(jìn)行咨詢!
In addition, after the construction of the cold recycling machine, after the pavement strength meets the requirements, use the air compressor to blow the dust, spread the priming oil, sprinkle stone chips on it, and then open the traffic. Come to our website for more related matters http://www.cpssc145.com Consult!
閱讀/ Recommended reading
- 冷再生機(jī)租賃:路面 “回春妙手” 能解哪些難題? 2025-07-02
- 冷再生機(jī)租賃:道路養(yǎng)護(hù)的 “省錢省力魔法棒” 2025-07-01
- 冷再生機(jī)租賃:解鎖路面 “煥新” 的全能技能包 2025-06-24
- 舊路翻新 “神器” 大盤點(diǎn):那些給力的冷再生機(jī)型號 2025-06-20
水泥撒布車料倉:讓存量監(jiān)測成為 “一目了然的智慧管家”
[2025-07-03]
在道路施工的 “戰(zhàn)場” 上,水泥撒布車如同精準(zhǔn)的 “材料輸送兵”,而其料倉內(nèi)的物料存量監(jiān)測,則是保障施工順利進(jìn)行的關(guān)鍵環(huán)節(jié)。如何讓施工人員隨時(shí)掌握料倉內(nèi)水泥的 “儲(chǔ)備情況”,...