冷再生機在道路施工前有哪些要求
來源:http://www.cpssc145.com/ 日期:2022-02-16 發(fā)布人:
在以前道路施工的時候,是需要將舊的瀝青路面鏟除,造成了很大的浪費,而現(xiàn)在冷再生機出現(xiàn),可以減少浪費。冷再生機是指瀝青路面就地冷再生是利用一體的再生設(shè)備、添加材料、一次拌和成型工藝,通過新鋪結(jié)構(gòu)面層,構(gòu)成舊路面改造新的一套完整體系。
In the previous road construction, it was necessary to eradicate the old asphalt pavement, resulting in a lot of waste. Now the emergence of cold regenerator can reduce waste. Cold recycling machine refers to the in-situ cold recycling of asphalt pavement. It uses the integrated recycling equipment, added materials and one-time mixing and forming process to form a new complete system for the reconstruction of old pavement through the newly paved structural surface.
準(zhǔn)備工作:冷再生租賃前的各項準(zhǔn)備工作在施工前到位,確保工期正常進行。主要內(nèi)容包括:人員準(zhǔn)備、機械準(zhǔn)備、材料準(zhǔn)備、交通協(xié)調(diào)及后勤保障。
Preparations: all preparations before cold regeneration lease shall be in place before construction to ensure the normal construction period. The main contents include: Personnel Preparation, machinery preparation, material preparation, traffic coordination and logistics support.


材料要求:水泥選用強度等級為32.5、初凝時間≥3h、終凝時間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥。水泥應(yīng)具有良好的工作性、低水化、高后期強度、耐久性、耐腐蝕性和抗裂性能。
Material requirements: Portland or ordinary portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h shall be selected. The cement shall have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
機械要求:工程施工過程通過再生機組來完成,再生機組包括:冷再生主機、水泥稀漿車、平地機、壓路機等。
Mechanical requirements: the construction process of the project is completed by regeneration unit, which includes cold regeneration host, cement slurry truck, grader, roller, etc.
人員要求:工程技術(shù)人員及機械操作人員應(yīng)經(jīng)過冷再生培訓(xùn)并經(jīng)過考核合格后方可上崗。
Personnel requirements: engineering technicians and mechanical operators shall receive cold regeneration training and pass the examination before taking the post.
工程協(xié)調(diào):作好施工總體計劃,采取不中斷交通半幅施工,作好施工期間交通疏導(dǎo)工作,準(zhǔn)備施工作業(yè)面的遮擋。
Project coordination: make the overall construction plan, take half width construction without interrupting traffic, do a good job in traffic dredging during construction, and prepare for the shelter of the construction surface.
本文由冷再生機租賃為您提供,我們的網(wǎng)站是:http://www.cpssc145.com 我們將以全心全意的熱情為您提供服務(wù),歡迎您的訪問
This article is provided for you by the cold regenerator rental. Our website is: http://www.cpssc145.com We will provide you with services with wholehearted enthusiasm. Welcome to visit
下一篇:冷再生機具備了那些技術(shù)特點? 上一篇:舊瀝青路面冷再生機械如何進行施工
閱讀/ Recommended reading
- 冷再生機租賃:解鎖路面 “煥新” 的全能技能包 2025-06-24
- 舊路翻新 “神器” 大盤點:那些給力的冷再生機型號 2025-06-20
- 揭秘冷再生機的 “體型密碼”:租賃尺寸選擇攻略 2025-06-18
- 怎么找到靠譜的冷在生租賃公司? 2025-06-17
冷再生機租賃:道路養(yǎng)護的 “省錢省力魔法棒”
[2025-07-01]
在道路養(yǎng)護與建設(shè)的領(lǐng)域中,冷再生機正扮演著愈發(fā)關(guān)鍵的角色。對于眾多施工項目而言,租賃冷再生機相比購置設(shè)備,恰似手握一根 “省錢省力魔法棒”,諸多優(yōu)勢令人難以拒絕。 In t...