使用冷再生機路面平整工作是如何進行的?
來源:http://www.cpssc145.com/ 日期:2021-10-15 發(fā)布人:
冷再是技術(shù)已經(jīng)是道路施工中較為常見的一種機器了,在使用冷再生機后的路面平整工作該如何進行呢?
Cold recycling technology is already a common machine in road construction. How to carry out the pavement leveling after using cold recycling technology?
壓路機對再生層穩(wěn)壓后,再生材料基本能夠處于穩(wěn)定狀態(tài),但仍不能完全再生機的輪跡,此時的輪跡深度約為0.5~1cm。
After the roller stabilizes the recycled layer, the recycled material can basically be in a stable state, but the wheel trace of the regenerator can not be completely eliminated. At this time, the wheel trace depth is about 0.5 ~ 1cm.
當(dāng)完成兩幅再生并全部穩(wěn)壓后,用平地機進行整平,一遍整平的目的是一幅、二幅右側(cè)共三排輪跡。二遍整平主要是為了把刮刀前的再生料均勻地攤開,同時兼顧再生層的橫向、縱向的坡度。再進行全作業(yè)段的找平。
After the regeneration of two frames is completed and all of them are stabilized, level them with a grader. The purpose of one leveling is to eliminate three rows of wheel tracks on the right side of one and two frames. The second leveling is mainly to spread the recycled material in front of the scraper evenly, and take into account the transverse and longitudinal slopes of the recycled layer. Then level the whole operation section.


冷再生機出租
Rental of cold regenerator
平地機對再生層找平后,如仍存在輪跡、麻面、局部骨料集中等現(xiàn)象,則需人工進行修補。方法是用再生新料將輪跡、麻面填滿,所用新料應(yīng)高出再生層0.5cm;將集中的骨料撒開,并用新料填充骨料的縫隙。
After leveling the reclaimed layer with grader, if there are still wheel marks, pitted surface, local aggregate concentration and other phenomena, it shall be repaired manually. The method is to fill the wheel trace and pitted surface with recycled new material, which shall be 0.5cm higher than the recycled layer; Scatter the concentrated aggregate and fill the gap of aggregate with new material.
閱讀/ Recommended reading
- 冷在生機租賃:路面養(yǎng)護措施——冷再生 2025-09-18
- 冷再生機租賃:冷再生技術(shù)助推綠色發(fā)展 2025-09-17
- 冷再生機租賃:經(jīng)研究和測試驗證的冷再生道路使用壽命超長 2025-09-16
- 冷在生機租賃:就地冷再生攤鋪工藝的施工要求 2025-09-08
冷再生機租賃:舊瀝青路面再生技術(shù)圖文詳解
[2025-09-19]
現(xiàn)場冷再生法是用大功率路面銑刨拌合機將路面混合料在原路面上就地銑刨、翻挖、破碎,再加入穩(wěn)定劑、水泥、水(或加入乳化瀝青)和骨料同時就地拌合,用路拌機原地拌合,碾壓成型?,F(xiàn)...